top of page
Y6M5BLJNI5HT5KBPWSO53ZYBVY.jpg

Sandwell Aquatics Centre

Scope of Works:

​

Description:

Drylining, plastering and Suspended Ceilings

The £73m Sandwell Aquatics Centre in Smethwick was built for the Birmingham 2022 Commonwealth Games (28 July to 08 August 2022).

​

The works included the laying of 190,000 pool tiles. Broughton's worked with our sub-contractor P. Plunkett Tiling Contractors Ltd to deliver the tiling package.

​

After the games, the venue will be reconfigured, including the removal of the 4,000 temporary seats, and additional leisure facilities will be added before the centre reopens as a community facility in the summer of 2023.

​

​